|
|
 |

Forward is to the right. Blue area are basins, tubs, or places where one can obtain water.
Red denotes vertical turbolift shafts. Turbolift stops are denoted with a 'T'.
Yellow denotes Jeffries tube access.
On this deck are Long Range Sensors, Engineering Mess, Conference Room B with Lounge, and Main Engineering.
There is a ladder to the upper left of the warp core (in red) that goes up to the upper level of Engineering, and another
ladder to the right of the warp core between the power transfer conduits (also in red) that goes down to antimatter
containment and the warp core ejection hatch on Deck 8.
|